This building black test has been completed and there was no impact to
services. All systems involved performed as expected.

The next test will be in approximately six months, provisionally
scheduled for Friday 20th November. A further announcement will be
sent out closer to the time.

Regards,

David

On 17 April 2015 at 20:16, David Croft <david at comtec.net.uk> wrote:
> Please be advised of the following maintenance window scheduled on the
> electrical supply at Comtec House:
>
> Date: Friday, 15th May 2015
> Start time: 19:30 BST (UTC+0100)
> End time: 22:30 BST (UTC+0100)
>
> Purpose
>
> Scheduled testing of electrical systems.
>
> The building black test is carried out on a biannual basis to test the
> generators' capability in supporting the building electrical
> infrastructure in the event of a power failure to the building.
>
> This test involves interrupting utility power to the building and
> allowing the generators to take the full building load for a 2 hour
> period during this window.
>
> Impact
>
> LOW
>
> No impact is expected from this routine testing. UPS systems will take
> the load during switchover. In the event of any unforeseen problems,
> UPS systems will take the load while utility power is restored.
>
> Services hosted at Comtec House are "at risk" during this window.
>
> Regards,
>
> David Croft
>
> --
> David Croft
> Lead Engineer
>
> Comtec Enterprises Ltd
> Comtec House
> 46a Albert Road North
> Reigate Industrial Estate
> Reigate
> Surrey RH2 9EL
>
> Tel: 0845 899 1400
> Fax: 0845 899 1401
> www.comtec.com
>
> For urgent operational issues please always contact noc at comtec.com
> or 0845 899 1423 and not any named individual.