News
Apr
17
[Comtec House] Maintenance window 15th May 2015
Posted by David Croft on 17 April 2015 07:16 PM
Please be advised of the following maintenance window scheduled on the
electrical supply at Comtec House:

Date: Friday, 15th May 2015
Start time: 19:30 BST (UTC+0100)
End time: 22:30 BST (UTC+0100)

Purpose

Scheduled testing of electrical systems.

The building black test is carried out on a biannual basis to test the
generators' capability in supporting the building electrical
infrastructure in the event of a power failure to the building.

This test involves interrupting utility power to the building and
allowing the generators to take the full building load for a 2 hour
period during this window.

Impact

LOW

No impact is expected from this routine testing. UPS systems will take
the load during switchover. In the event of any unforeseen problems,
UPS systems will take the load while utility power is restored.

Services hosted at Comtec House are "at risk" during this window.

Regards,

David Croft

Comments (0)
Post a new comment
 
 
Full Name:
Email:
Comments: